Problem:
During the operation of the building, cracks appeared on the load-bearing walls, including window and door openings. The deflection of the slab inside the room was also visually noticeable.
Foundation:
Monolithic reinforced concrete floor slab with a thickness of 350 mm.
Task:
Strengthen the ground, fill the void at the point of contact of the floor slab and the ground inside the room.
Solution:
Before starting work on strengthening the base, a comprehensive survey was conducted to determine the density of the soil base, identify low-bearing horizons of the soil thickness and detect voids under the floor slab.
To solve the problem of strengthening the ground, the method of deep Lifting was chosen. Work was carried out from the outside of the building, injection was performed in several levels, injection tubes were installed at a certain angle in accordance with the project.
To solve the problem of filling the void under the floor slab, work was carried out inside the building, injection was performed strictly vertically.
After the completion of work on strengthening the foundation soil and filling the voids, a complex of geodetic works was performed to install control marks for further observation and regular survey.
Technological excessive subsidence of a building columns
Stopping subsidence and increasing the load-bearing capacity of the pile foundation
In a residential building, a floor slab sank after a pipe burst
Reinforcement of base soils and re-leveling of floor slab
Leakage of the retaining wall of the entrance to the underground garage
Compaction of soils and plugging of leaks in the retaining wall structure
Eroding the foundation of the supporting columns
Strengthening the foundation foundation without disrupting the entire project schedule
Reinforcement of foundation soils and stabilization of the foundation
Reinforcement of foundation soils and stabilization of the foundation
Strengthening the foundation soil and stabilizing the foundation
Strengthening the foundation soil and stabilizing the foundation
Subsidence of the slab and the appearance of a longitudinal crack
Compaction of the soil with filling the gap under the slab