Problem:
When installing a railway foundation on a pile field, a void was formed under the slab. Due to the fact that the foundation perceived dynamic loads from the technical activites and working conveyor, the project designers decided that it was necessary to recreate the support of the grillboard on the base over the entire area. This solution reduces the negative impact of dynamic loads on piles.
Task:
Recreating the base slab support on the base over the entire area.
Decision:
To solve this problem, a preliminary comprehensive survey of the foundation base was conducted, which confirmed the loosening of the ground soil and the presence of voids under the slab with a capacity of up to 60 cm.
The technical solution meant to restore the solid foundation-ground contact by compensating injection of self-expanding GeoResin resins under the railway foundation.
Technological excessive subsidence of a building columns
Stopping subsidence and increasing the load-bearing capacity of the pile foundation
In a residential building, a floor slab sank after a pipe burst
Reinforcement of base soils and re-leveling of floor slab
Leakage of the retaining wall of the entrance to the underground garage
Compaction of soils and plugging of leaks in the retaining wall structure
Eroding the foundation of the supporting columns
Strengthening the foundation foundation without disrupting the entire project schedule
Reinforcement of foundation soils and stabilization of the foundation
Reinforcement of foundation soils and stabilization of the foundation
Strengthening the foundation soil and stabilizing the foundation
Strengthening the foundation soil and stabilizing the foundation
Subsidence of the slab and the appearance of a longitudinal crack
Compaction of the soil with filling the gap under the slab