The building was renovated and reconstructed on the existing old foundation. After the construction of the walls and roof, the foundation settled with deformations that were reflected on the floor slabs.
Within 7 working days, work was carried out to strengthen the soil foundation base with the use of GeoResin DEEP Lifting technology and leveling the floor slabs.
The result of this work was to stop the process of foundation subsidence and re-leveling the working surface of the floor slabs in warehouses.
Technological excessive subsidence of a building columns
Stopping subsidence and increasing the load-bearing capacity of the pile foundation
In a residential building, a floor slab sank after a pipe burst
Reinforcement of base soils and re-leveling of floor slab
Leakage of the retaining wall of the entrance to the underground garage
Compaction of soils and plugging of leaks in the retaining wall structure
Eroding the foundation of the supporting columns
Strengthening the foundation foundation without disrupting the entire project schedule
Reinforcement of foundation soils and stabilization of the foundation
Reinforcement of foundation soils and stabilization of the foundation
Strengthening the foundation soil and stabilizing the foundation
Strengthening the foundation soil and stabilizing the foundation
Subsidence of the slab and the appearance of a longitudinal crack
Compaction of the soil with filling the gap under the slab